3
Construction :
1959 to 1964
Maximum used volume of basins :
6.8 million m³
Maximum water level change :
16 m ~ 1.6 at
Flow during power generation :
432.5 m³/s
Mean daily power generation time:
4.25h
Mean daily pumping time:
7.25h
SEO main figures:
|